Nureva Energy develops medium and large-scale photovoltaic power plants. We're looking for partners to support our projects.
Two scales, one standard.
01 — What we do
Nureva Energy designs, develops and structures photovoltaic projects at two complementary scales — from industrial self-consumption to utility-scale plants connected to the high-voltage grid.
01
Medium-scale
1 – 20 MWp · Industrial self-consumption
Photovoltaic plants dedicated to industrial complexes and sites — hospitals, manufacturing, logistics and large infrastructure — cutting their energy bill and carbon footprint over the long term.
Capacity
1 – 20 MWp
Model
Self-consumption · Private PPA
Grid
Low / medium voltage
For
Industry · Hospitals · Logistics
02
Large-scale
> 100 MWp · Grid-connected power plants
Utility-scale solar power plants above 100 MW, connected to the national high-voltage grid and developed on secured land in the sunniest regions of Tunisia.
Capacity
100 – 300 MWp
Model
IPP · Long-term PPA
Grid
150 kV high voltage
For
National grid · Large off-takers
Flagship project · Kébili, Tunisia
Our flagship project: Kébili.
02 — The project
In southern Tunisia, Nureva Energy is developing a 200–280 MW photovoltaic power plant on a secured site of around 330 hectares — flat, unobstructed and exceptionally sunny.
01
Location
~15 km from Kébili city and ~525 km from Tunis, in one of Tunisia's sunniest regions.
02
Land
~330 hectares secured, flat and free of any obstacle — no buildings or vegetation — within a 1 km radius.
03
Grid connection
4.5 km from the 150 kV substation; a new 150 kV high-voltage line runs alongside the site.
04
Solar resource
High yield: up to 1,900 kWh/kWp/year with fixed structures, and 2,500 kWh/kWp/year with single-axis tracking.
Progress
2026
01
Done
Land secured — ~330 hectares
02
In progress
Regulatory procedures and permit applications underway
03
Upcoming
Next development stages
Key figures
03 — Key figures
200–280MW
Targeted plant capacity
~330ha
Land secured
2,500kWh/kWp
Annual yield (single-axis tracking)
4.5km
From the 150 kV substation
04 — Partnership
Looking for partners.
Nureva Energy is looking for partners — investors, developers and industrial players — to support the development of its solar projects in Tunisia.